We are nothing after our death. Let us donate our body organs for the poor.

Be not afraid of anything. You will do marvelous work The moment you fear, you are nobody - Swamy Vivekananda

If you think safety is expensive, try an accident... - O.P.Kharbanda

Preventable accidents, if they are not prevented due to our negligence, it is nothing short of a murder - Dr. Sarvepalli Radha Krishna, 2nd President of India

Zero accidents through zero unsafe behaviors. Do not be complacent that there are no accidents. There may be near miss accidents (NMAs). With luck/chance, somebody escaped knowingly or unknown to the person. But, we can't be safe, if we depend upon the luck.

Safety culture is how the organization behaves when no one is watching.

We make No compromise with respect to Morality, Ethics, or Safety. If a design or work practice is perceived to be unsafe, we do not proceed until the issue is resolved. - Mission statement by S&B Engineers & Consultants Ltd. http://www.sbec.com/safety/

Human meat gets least priority - A doctor's comment on accidents

CSB video excerpts from Dr.Trevor Kletz, http://www.youtube.com/watch?v=XQn5fL62KL8

Showing posts with label equipment conditioning. Show all posts
Showing posts with label equipment conditioning. Show all posts

Nov 18, 2012

Measures to be taken before a plant shutdown

The following link provides good information on the above topic. 
It suggests that one should engage experience technical persons for shutting down a plant and equipment conditioning, which may not be required to operate in the near future, but may be required at a later date. All process holdups should be drained, cleaned, protective coats applied, instruments/sensors kept in dry condition and kept in good condition so that when plant is to be restarted, it can be done with minimal costs, head aches and damage. One should also record all measures taken during shut down and to be taken while restarting as it is likely that same technical persons may not be available in the future. Cannibalizing also should be avoided so that plant can be restarted at short notice without searching for missing motors, pumps, valves, vessels, etc. One should also ensure periodical maintenance of the equipment and auxiliaries of plant that was shutdown. Else, we have to be satisfied in getting scrap value by sale instead of its full value.



Featured Post

Reduced my weight from 96 to 76 kg and tummy from 38-40 to 34-35 inches in about 9 months

I am working in the safety department of a government organization. As a part of the job, I used to go around and interact with person...